A new 33 kV intake and 11 kV network for a working gold mine in Zimbabwe, from the utility point of supply down to the mine's 400 V process loads. In construction.
- Utility intake
- 33 kV
- 33/11 kV transformers
- 3 × 5 MVA
The project
Phase 1 rebuilds the mine's supply. Power comes from the existing ZETDC 33 kV outdoor yard into a new 33 kV intake substation, through three new 5 MVA 33/11 kV transformers to new 11 kV supply and feeder substations, then through four 2 MVA 11 kV/400 V transformers and two new 400 V containers to the mine's process loads.
Each 5 MVA transformer is fitted with a 300 A neutral earthing resistor, and the 400 V panels include static var generators for power factor management.
The 11 kV supply substation is built with extendable switchgear, ready for future on-site generation and storage.
The project is in construction. A full case study and footage will follow on commissioning.
Delivered cross-border, with procurement, shipping, customs clearance, local labour and utility co-ordination managed by Sunbird.
Key facts
- Client: RAN Mines
- Location: Bindura, Zimbabwe
- Sector: Mining & Heavy Industry
- System type: MV reticulation and substations
- Key equipment: TGOOD TGS-40.5 and TAP-17.5 switchgear · Siemens 7SR1706 protection · Schneider PM5560 / PM5660 metering · ComAp energy management
- Status: In construction
Related: MV substations and grid connection · Mining · Zimbabwe